Downtown Revitalization Project |
|
|
||
|
After identifying a select number of downtown buildings as prime
candidates for renovation, the Town of Ware Community Development Department
retained Thomas
Mayo Associates to
conduct a three phase feasibility study for the rehabilitation of two major
central business district buildings; the Cebula Block and the Belcher
Block. During phase one existing
conditions were documented and preliminary recommendations were made
addressing issues of historic preservation, structural integrity, means of
egress, and energy. During phase two,
development alternatives were explored and specific design proposals were
developed for rehabilitating the buildings, including construction cost
estimates and a financial analysis report which identified sources of funds
and financial strategies for proceeding with construction. Phase three included preparation of final
design drawings for each building.
Work completed under this study will enable the town and building
owners to proceed with a mutually beneficial construction project which
should materially improve the central business district and serve as a
catalyst for revitalization. |
|
||
|
||||