Downtown Revitalization Project |
|
|
Cebula
Block: Documentation of Existing Conditions Belcher
Block: Typical Floor Plan, Design
Proposal |
After identifying a select number of downtown buildings as prime
candidates for renovation, the Town of Ware Community Development Department
retained Thomas Mayo Associates to conduct a three phase feasibility study for the
rehabilitation of two major central business district buildings; the Cebula
Block and the Belcher Block. During
phase one existing conditions were documented and preliminary recommendations
were made addressing issues of historic preservation, structural integrity,
means of egress, and energy. During
phase two, development alternatives were explored and specific design
proposals were developed for rehabilitating the buildings, including
construction cost estimates and a financial analysis report which identified
sources of funds and financial strategies for proceeding with
construction. Phase three included
preparation of final design drawings for each building. Work completed under this study will enable
the town and building owners to proceed with a mutually beneficial
construction project which should materially improve the central business
district and serves as a catalyst for revitalization. |
|
Historic
Photograph of Main Street showing Cebula Block in Foreground |
|
[Back to TMA Urban Design and Planning Projects Page]